Shenzhen,Guangdong,China
}
Mon-Fri: 8:00AM-5:30PM(GMT+8)

Final ATP Line for Energy Storage Packs

Final ATP Line for Energy Storage Packs

This line integrates automated assembly, testing, and packaging processes, dedicated to the final inspection and shipping preparation of energy storage packs. It ensures the full functionality and outgoing quality of every product for efficient, reliable one-stop production.

Dimension(L*W*H)

550000 *85000*3000(mm)(including AGV aisle)

Production Capacity

PPM=30

Applicable Products

Cells for PACK

● Modular unit, easy installation and maintenance, simple and safe operation, flexible combinations according to user requirements
●Whole-line product process data control with traceability support and MES protocol compatibility.
● Human–machine integrated, with intelligent key units, the use of laser AGV trackless transport.

Process Procedure:
Manual Housing Loading (Loop Line) → Core Absence Inspection → Manual Cell Loading (Loop Line) → Rotary Clamping & Gripping Unloading → Manual Pre-Burn-in ATE Test → Pre-Burn-in Loading & Unloading → Pre-Test NG Product Buffering → AGV Pull-in of Burn-in Cart → Burn-in Test → AGV Pull-out of Burn-in Cart → Post-Burn-in Loading & Unloading → Manual Post-Burn-in ATE Test → Product Rotary Line Transfer → Post-Test NG Product Buffering → Product Pre-Cartonization Flipping → Product Cartoning Suction Lifting → (① Manual Cleaning, Bagging & Carton Insertion → Manual Pre-Packaging Inspection → Product Palletizing) / (② Test Empty Board Loading → Test Fixture Return Flow)

Corporate Foundation
Proof of Capability
Global Ecosystem
Service Types
Product Services
Full-range solutions from power supplies to test instruments

Quality Inspection

Full-process testing solutions covering every production stage
After-sales Services
Dedicated ongoing support to ensure product reliability.
By Industry
Corporate Dynamics
Industry Perspective
Knowledge Hub
Social Responsibility