APPLICATIONS / NEW ENERGY

PV Inverter & Energy Storage Testing Solutions

Photovoltaic inverter ATE, inverter production lines and burn-in systems for portable energy storage power products.

JETTEST PV & Energy Storage Inverter Line

PV & Energy Storage Inverter Line

Choose Equipment for Your Production Stage

Match the equipment to the power-conversion product: a PV inverter test station, an integrated inverter production line or a portable power station burn-in system. Battery PACK assembly is covered separately in our Battery application.

PV inverter testing

Review a dedicated photovoltaic power supply ATE system for inverter testing with DC input and AC load conditions.

Photovoltaic Power Supply ATE →

Inverter production

Connect assembly with pre-burn-in ATE, burn-in, post-burn-in ATE and packing operations.

PV & Energy Storage Inverter Line →

Portable power stations

Select a mobile energy storage burn-in system for the documented DC charge and AC discharge functions.

Mobile Energy Storage Burn-in System →

Testing & Production Capabilities

Dedicated PV test station

The photovoltaic power supply test system is listed for photovoltaic inverters. Its handbook specifies a DC input range and AC loading; test conditions must match the product configuration.

Testing around burn-in

The inverter line places ATE testing before and after burn-in. Its process includes manual wiring stations, transfer equipment and downstream packaging.

Portable energy storage

The mobile energy storage cabinet is specified for outdoor storage power supplies. Its documented configuration includes 24 burn-in positions, DC charging and AC discharging.

Inverter Testing & Packaging Workflow

  1. 01   →

    Assemble & connect

    Assembly, product transfer and manual wiring at the test section.

  2. 02   →

    Pre-burn-in ATE

    Electrical testing before products enter the burn-in process.

  3. 03   →

    Burn-in & retest

    Burn-in followed by post-burn-in ATE testing.

  4. 04

    Pack & palletize

    Suction-assisted bagging and carton handling, sealing and palletizing.

Fixture return: Tooling returns through the assembly and test-line return routes.   Operation: The listed process combines manual wiring with automated transfer.

Reference: PV & Energy Storage Inverter Testing and Packaging Line. Portable power station burn-in uses a separate system.

JETTEST Photovoltaic Power Supply ATE

Photovoltaic Power Supply ATE

A test system for photovoltaic inverter products.

The listed configuration uses DC input and an AC load. Review the test range against your inverter specifications.

JETTEST PV & Energy Storage Inverter Line

PV & Energy Storage Inverter Line

Assembly, testing, burn-in and packaging for inverter production.

Pre- and post-burn-in ATE stations, product transfer, carton handling, sealing and palletizing.

JETTEST Mobile Energy Storage Burn-in System

Mobile Energy Storage Burn-in System

Burn-in equipment for outdoor portable power stations.

The listed system has 24 slots, with DC charging and AC discharging functions.

Equipment functions, test conditions and handling arrangements are defined for the selected product and project configuration.

Define Your Equipment Configuration

Prepare the following information for a focused discussion with JETTEST.

  • Inverter or portable power product specifications
  • Input/output ratings, connectors and test sequence
  • Burn-in conditions and required production output
  • Floor space, product handling and factory data interfaces

New Energy Questions

How does the ATE system differ from the inverter line?

The photovoltaic ATE is a dedicated test system. The inverter line connects assembly, testing, burn-in and packaging stages, so it addresses a wider production workflow.

Is equipment available for portable power stations?

Yes. The mobile energy storage burn-in system is listed for outdoor portable power products and includes charge/discharge operation. Its electrical ratings must be matched to your product.

Where should I look for battery PACK assembly?

The Battery application covers household energy storage PACK assembly and the final ATP line. This page focuses on inverter and portable power products.

Discuss Your New Energy Production Requirements

Share your product specifications, required process and production target so JETTEST can review the appropriate equipment configuration.

Corporate Foundation
Proof of Capability
Global Ecosystem
OUR SERVICE
Corporate Dynamics
Industry Perspective
Knowledge Hub
Social Responsibility

Consumer Electronics

Consumer Electronics

Power, Energy & Batteries

Power Supplies

New Energy

Battery

Electronic Components

Electronic Components