PV Inverter & Energy Storage Testing Solutions
Photovoltaic inverter ATE, inverter production lines and burn-in systems for portable energy storage power products.
Choose Equipment for Your Production Stage
Match the equipment to the power-conversion product: a PV inverter test station, an integrated inverter production line or a portable power station burn-in system. Battery PACK assembly is covered separately in our Battery application.
PV inverter testing
Review a dedicated photovoltaic power supply ATE system for inverter testing with DC input and AC load conditions.
Inverter production
Connect assembly with pre-burn-in ATE, burn-in, post-burn-in ATE and packing operations.
Portable power stations
Select a mobile energy storage burn-in system for the documented DC charge and AC discharge functions.
Testing & Production Capabilities
Dedicated PV test station
The photovoltaic power supply test system is listed for photovoltaic inverters. Its handbook specifies a DC input range and AC loading; test conditions must match the product configuration.
Testing around burn-in
The inverter line places ATE testing before and after burn-in. Its process includes manual wiring stations, transfer equipment and downstream packaging.
Portable energy storage
The mobile energy storage cabinet is specified for outdoor storage power supplies. Its documented configuration includes 24 burn-in positions, DC charging and AC discharging.
Inverter Testing & Packaging Workflow
-
01 →
Assemble & connect
Assembly, product transfer and manual wiring at the test section.
-
02 →
Pre-burn-in ATE
Electrical testing before products enter the burn-in process.
-
03 →
Burn-in & retest
Burn-in followed by post-burn-in ATE testing.
-
04
Pack & palletize
Suction-assisted bagging and carton handling, sealing and palletizing.
Fixture return: Tooling returns through the assembly and test-line return routes. Operation: The listed process combines manual wiring with automated transfer.
Reference: PV & Energy Storage Inverter Testing and Packaging Line. Portable power station burn-in uses a separate system.
Explore Related JETTEST Equipment
Photovoltaic Power Supply ATE
A test system for photovoltaic inverter products.
The listed configuration uses DC input and an AC load. Review the test range against your inverter specifications.
PV & Energy Storage Inverter Line
Assembly, testing, burn-in and packaging for inverter production.
Pre- and post-burn-in ATE stations, product transfer, carton handling, sealing and palletizing.
Equipment functions, test conditions and handling arrangements are defined for the selected product and project configuration.
Define Your Equipment Configuration
Prepare the following information for a focused discussion with JETTEST.
- Inverter or portable power product specifications
- Input/output ratings, connectors and test sequence
- Burn-in conditions and required production output
- Floor space, product handling and factory data interfaces
New Energy Questions
How does the ATE system differ from the inverter line?
The photovoltaic ATE is a dedicated test system. The inverter line connects assembly, testing, burn-in and packaging stages, so it addresses a wider production workflow.
Is equipment available for portable power stations?
Yes. The mobile energy storage burn-in system is listed for outdoor portable power products and includes charge/discharge operation. Its electrical ratings must be matched to your product.
Where should I look for battery PACK assembly?
The Battery application covers household energy storage PACK assembly and the final ATP line. This page focuses on inverter and portable power products.
Discuss Your New Energy Production Requirements
Share your product specifications, required process and production target so JETTEST can review the appropriate equipment configuration.